Learn
Process behavior charts, explained
Tell real change from routine noise in any business metric. Start with the guide, look up a term, or try the free calculator.
Start here
- What Is a Process Behavior Chart (XmR Chart)?: A plain-English guide to process behavior charts (XmR charts): how the limits are calculated, the three signals of real change, and how to use one on a business metric.
- Free XmR chart calculator: paste your numbers and get the chart and a verdict.
- Research: how much week-over-week change is just noise? Most large moves in 40 traffic series were routine.
- Free XmR chart template: the same method in an Excel or Google Sheets spreadsheet.
- Worked examples: conversion rate, support tickets, revenue, NPS, churn, deploys and page load time on process behavior charts.
Glossary
- XmR chart: The XmR chart (individuals and moving range chart) explained: the two charts, the formulas, and when to use it.
- Natural process limits: How to calculate natural process limits for an XmR chart, what they mean, and how they differ from targets and specification limits.
- Moving range: The moving range in an XmR chart: how to calculate it, the average moving range, and the upper range limit.
- The 2.66 constant: Where the 2.66 scaling factor in XmR chart limits comes from, and the related 3.268 and 1.128 constants.
- Upper range limit: The upper range limit (3.268 × average moving range) on an mR chart, and what a moving range above it means.
- Routine vs exceptional variation: The difference between routine and exceptional variation, also called common-cause and special-cause variation, and why it matters for business metrics.
- Run of 8: The run-of-8 detection rule on a process behavior chart: eight or more points in a row on one side of the average signal a sustained shift.
- 3 of 4 rule: The 3-of-4 detection rule: three of four successive points closer to the same limit than to the average signal a moderate shift.
- Baseline period: Choosing the baseline period for XmR chart limits: how many points, which period, and when to freeze the limits.
- Recalculating limits: When to recalculate the natural process limits on an XmR chart: after a sustained, understood shift, not after every new point.
- Predictable process: What it means for a process to be predictable, or in statistical control, and what a process behavior chart lets you predict.
Comparisons
- XmR vs standard deviation bands: Why XmR chart limits from the moving range find real changes that mean ± 2 or 3 standard deviation bands hide.
- XmR vs week-over-week change: Why week-over-week percentage changes mislead, and how an XmR chart tells you whether a change is real.
- XmR vs anomaly detection: How process behavior charts compare with machine-learning anomaly detection for spotting real changes in business metrics.
- XmR vs A/B tests: When to use an A/B test and when to use a process behavior (XmR) chart to judge whether a change to a product or process worked.
- XmR spreadsheet vs Mostly Stable: What a spreadsheet XmR chart template does, what Mostly Stable adds, and when each is the better fit.