What Is a Process Behavior Chart (XmR Chart)?

A process behavior chart (for one value per period, an XmR or individuals chart) plots a metric over time with its average and natural process limits, calculated from the metric's own history. Points inside the limits are routine variation. A point outside them, or a sustained pattern, is a signal that something changed and is worth investigating.

Key facts

  • Natural process limits = average ± 2.66 × average moving range.
  • Moving range = the absolute difference between each value and the one before it.
  • Upper range limit on the moving range chart = 3.268 × average moving range.
  • Three signals of real change: a point outside the limits; 8 or more points in a row on one side of the average; 3 of 4 points in a row closer to the same limit than to the average.
  • Useful limits can come from as few as 5 or 6 values; treat them as provisional until you have about 20, and 20 to 30 values give dependable limits.
Weekly signups: illustrative process behavior chart Centre line 40.2, upper natural process limit 52.2, lower natural process limit 28.1. 8 of 26 points are part of a signal. 30 40 50 W1 W3 W5 W7 W9 W11 W13 W15 W17 W19 W21 W23 W25 limits from first 18 Upper 52.2 Average 40.2 Lower 28.1 W1: Weekly signups 41 W2: Weekly signups 37 W3: Weekly signups 44 W4: Weekly signups 39 W5: Weekly signups 35 W6: Weekly signups 42 W7: Weekly signups 46 W8: Weekly signups 38 W9: Weekly signups 40 W10: Weekly signups 43 W11: Weekly signups 36 W12: Weekly signups 41 W13: Weekly signups 45 W14: Weekly signups 39 W15: Weekly signups 37 W16: Weekly signups 42 W17: Weekly signups 40 W18: Weekly signups 38 W19: Weekly signups 49 (signal) W20: Weekly signups 52 (signal) W21: Weekly signups 47 (signal) W22: Weekly signups 57 (signal) W23: Weekly signups 51 (signal) W24: Weekly signups 50 (signal) W25: Weekly signups 54 (signal) W26: Weekly signups 52 (signal)
Illustrative data: Weekly signups really changed: 8 weeks in a row from week 19 sat above the old average, and weeks 22 and 25 went above the upper limit. That is a signal, not noise. Open this example in the calculator.

Where it comes from

Walter Shewhart invented the control chart at Western Electric and Bell Telephone Laboratories in the 1920s to tell routine manufacturing variation from real problems. W. Edwards Deming spread the idea, and Donald Wheeler adapted it for management data in Understanding Variation (2nd ed., 2000), where he calls it the process behavior chart. The version for one value per day, week or month is the XmR chart: an X chart of the individual values and an mR chart of the moving ranges.

How to build one

  1. Collect the values in time order. One value per period, such as weekly signups or daily tickets. Aim for 20 to 30 points.
  2. Calculate the average. This is the centre line.
  3. Calculate the moving ranges. For each value after the first, take the absolute difference from the previous value. Average them.
  4. Calculate the natural process limits. Average ± 2.66 × average moving range.
  5. Plot the values with the three lines, and below them the moving ranges with the upper range limit (3.268 × average moving range).
  6. Look for signals. Everything else is routine variation.

You can do this in a spreadsheet, or paste the numbers into the free XmR chart calculator.

The three signals of real change

If none of these appears, the ups and downs are routine variation. Explaining each one wastes time, and reacting to them tends to make results noisier.

What the chart tells you to do

  • A signal: look for what changed around the first signal point, such as a release, a campaign, a pricing or tracking change, or a new source of customers.
  • No signal, and the level is fine: leave it alone. The metric is predictable within its limits.
  • No signal, but the level isn't good enough: the fix is to change the process. Explaining individual points won't move it.

Why not just compare to last week?

A week-over-week percentage change compares two points and treats every difference as news. A process behavior chart compares each point with the metric's own history. It can tell you that a 10% drop is normal for this metric, or that a 4% rise is a real shift. See XmR chart vs week-over-week change.

Frequently asked questions

Is a process behavior chart the same as a control chart?

Yes. Process behavior chart is Donald Wheeler's name for Shewhart's control chart, chosen to stress that it describes how a process actually behaves rather than controlling it to a target. The XmR (individuals) chart is the version for one value per period, which suits most business metrics.

Does my data need to be normally distributed?

No. The limits work well in practice for the skewed and lumpy data business metrics usually produce. They are a guide to action, not a probability statement.

How many data points do I need?

Useful limits can come from as few as 5 or 6 values. Treat them as provisional until you have about 20, and recalculate as data accumulates; 20 to 30 values give dependable limits.

What's the difference between natural process limits and targets?

Natural process limits are calculated from the data and describe what the process actually produces. Targets and specifications are what you want. A process can be perfectly predictable and still miss its target.

Updated 2026-11-08. Method: Shewhart's control chart as taught by Donald Wheeler in Understanding Variation.